Subiyanta, E., Aldan, M., & Soleh, M. (2022). Load Flow Analysis at Babakan Substations for Industry Growth Devolopment Using ETAP Power Station 12.6 Softwere. Mestro: Jurnal Teknik Mesin Dan Elektro, 4(01), 14-18. https://doi.org/10.47685/mestro.v5i01.376